![]() | ||
| STS-115 Shuttle Mission Imagery | |
![]() high res (1.3 M) low res (90 K) | JSC2006-E-30908 (August 2006) --- Computer generated image of the STS-115/12A configuration. The next shuttle mission by Atlantis, targeted for late August, will resume assembly of the ISS with the delivery of the P3/P4 pre-integrated truss and the second set of U.S. solar arrays. |
Curator: Kim
Dismukes | Responsible NASA Official: John Ira Petty | Updated: 08/02/2006 |