These scripts enable navigation. It requires javascript be enabled in your browser. Human Space Flight WebHuman Space Flight WebHuman Space Flight WebHuman Space Flight WebHuman Space Flight WebHuman Space Flight WebHuman Space Flight WebHuman Space Flight WebHuman Space Flight Web
Skip navigation to content.
Human Space Flight WebReturn to Human Space Flight home page
Human Space Flight Web
Human Space Flight Web

STS-120 Shuttle Mission Imagery
Engineers assemble cufflink apparatuses
high res (1.5 M) low res (93 K)
JSC2007-E-095025 (31 Oct. 2007) --- With plans being put together for a contingency EVA on the STS-120 mission, contractor and NASA engineers and astronauts gather in JSC's Space Vehicle Mockup Facility on Oct. 31 to rehearse possible ISS solar array repair procedures to be used by STS-120 spacewalkers. From center left, David Mathers, Kevin Pehr and Scott Keepers assemble "cufflink" apparatuses like those the crew might fashion onboard to attach to the solar arrays and take the structural load off of the broken hinge.

Curator: Kim Dismukes | Responsible NASA Official: John Ira Petty | Updated: 10/31/2007
Web Accessibility and Policy Notices