These scripts enable navigation. It requires javascript be enabled in your browser. Human Space Flight WebHuman Space Flight WebHuman Space Flight WebHuman Space Flight WebHuman Space Flight WebHuman Space Flight WebHuman Space Flight WebHuman Space Flight WebHuman Space Flight Web
Skip navigation to content.
Human Space Flight WebReturn to Human Space Flight home page
Human Space Flight Web
Human Space Flight Web

STS-120 Shuttle Mission Imagery
Astronauts Daniel Tani and Scott Parazynski
high res (1.2 M) low res (88 K)
S120-E-010980 (28 Oct. 2007) --- Astronauts Daniel Tani (left), Expedition 16 flight engineer, and Scott Parazynski, STS-120 mission specialist, participate in the second scheduled session of extravehicular activity (EVA) as construction continues on the International Space Station. During the 6-hour, 33-minute spacewalk Tani and Parazynski outfitted the Harmony module, mated the power and data grapple fixture and reconfigured connectors on the starboard 1 (S1) truss that will allow the radiator on S1 to be deployed from the ground later. Also the spacewalkers worked in tandem to disconnect cables from the P6 truss, allowing it to be removed from the Z1 truss. Tani also visually inspected the station's starboard Solar Alpha Rotary Joint (SARJ) and gathered samples of "shavings" he found under the joint's multi-layer insulation covers.

Curator: Kim Dismukes | Responsible NASA Official: John Ira Petty | Updated: 12/12/2007
Web Accessibility and Policy Notices