This
video is an animation of the deployment of the P6 Integrated Truss
Structure’s solar arrays during STS-97. MPEG
Video Format (7.6 M)
This
video describes the layout of Space Shuttle Endeavour’s payload
bay during STS-97. The payload bay will contain the Orbiter Docking
System, an IMAX 3-D Camera and the P6 Integrated Truss Structure,
which will be installed onto the International Space Station. MPEG
Video Format (4.1 M)
STS-97
Lead EVA Officer Glenda Laws describes activities during the second
space walk by Mission Specialists Carlos Noriega and Joe Tanner
during the mission. Three space walks will be performed and Space
Shuttle Endeavour’s robotic arm will be used to install the P6 Integrated
Truss Structure onto the International Space Station. The video
contains animation and footage from the Neutral Buoyancy Laboratory. Media Player Format -
28K
/ 56K Real Video Format -
28K
/ 56K
STS-97 Lead
EVA Officer Glenda Laws describes activities during the second
space walk by Mission Specialists Carlos Noriega and Joe Tanner
during the mission. Three space walks will be performed and Space
Shuttle Endeavour’s robotic arm will be used to install the P6
Integrated Truss Structure onto the International Space Station.
The video contains animation and footage from the Neutral Buoyancy
Laboratory. Media Player Format -
28K
/ 56K Real Video Format -
28K
/ 56K
Crew Activity
Report for STS-97 Flight Day 6. This video provides information
related to the second space walk performed by Mission Specialists
Joe Tanner and Carlos Noriega. They connected power lines from
the P6 solar arrays to the International Space Station, moved
the S-band antenna from the Z1 Truss to the top of the P6 Truss,
used the wireless video systems mounted on the top of their EVA
suits to provide images of the tensioning system on the starboard
P6 solar array, and performed work preparing Pressurized Mating
Adapter 2 for its movement on a later space shuttle flight. Also
included is an exchange between station Astronaut Bill Shepherd
and the U.S. ground crew regarding upcoming activities. Media Player Format -
28K
/ 56K Real Video Format -
28K
/ 56K
Crew Activity
Report for STS-97 Flight Day 5. This video centers around the
status and deployment of the solar arrays on the P6 Truss on the
International Space Station. Information about the deployment
of the first solar array and the status of the electrical charging
system is included, along with the strategy for deploying the
second solar array to avoid the situation encountered with the
first solar array. The video then details the deployment of the
second solar array, which included methodology developed by the
astronauts on Space Station Endeavour and the ground crew in Mission
Control. Media Player Format -
28K
/ 56K Real Video Format -
28K
/ 56K