Shuttle
Reference Manual
Mission
Events Summary
|
|
Terminal
Count Extends from T minus 20 minutes through SRB
ignition.
First Stage Extends from SRB ignition through SRB separation.
Second Stage Begins at SRB separation and extends through
main engine cutoff and ET separation.
Ascent Abort
Modes Abort may become necessary if there is a failure
that affects vehicle performance.
Manual Thrust
Vector Control Substitutes inputs from RHC for automatic
commands from Guidance.
Orbit
Insertion Following MECO, one or two propulsive thrusting
periods move the vehicle to the desired orbital altitude.
On Orbit Guidance, navigation and control during orbit
phase.
On-Orbit
Checkout The day before deorbit, the crew performs
a checkout of systems used during entry.
Deorbit Phase includes deorbit burn preparation through
descent to 400,000 feet.
Entry Phase begins at 400,000 feet and ends at touchdown.
|