Radiogram 1210
Form 24 for 05/25/01
Progress Unloading, Satellite Navigation System 1(2) [ÀÑÍ1(2)] Test.
|
GMT |
Crew |
Activity / ODF or R/G |
|
06:00 - 06:10 |
|
Morning inspection |
|
06:10 - 06:40 |
|
Post-sleep |
|
06:40 - 07:30 |
|
BREAKFAST |
|
07:30 - 07:45 |
|
Daily planning conference |
|
07:45 - 08:00 |
CDR |
ÁÌÏ Absorbent Cartridge Ô2 Regeneration (end) / SM ACS / pages 7-4 and 7-5, item 7.3, steps 2,4 |
|
07:45 - 08:15 |
FE-1, FE-2 |
Work prep |
|
08:00 - 08:15 |
CDR |
Work prep |
|
08:15 - 10:15 |
|
Progress Ì1-6 unloading using IMS / Progress Transfers / + r/g |
|
10:15 - 10:40 |
FE-2 |
LAB Payload Status Check |
|
10:15 - 11:45 |
CDR |
Physical Exercise TVIS |
|
10:15 - 10:30 |
FE-1 |
TORSO Data Prep for Downlink, Cable Demate after Data Transfer is complete |
|
10:30 - 11:10 |
FE-1 |
Dosimeter data prep for downlink, MDU dosimeter recharge |
|
10:40 - 11:00 |
FE-2 |
Delta file prep for downlink |
|
11:00 - 11:30 |
FE-2 |
IRED and TVIS data download to MEC |
|
11:10 - 12:40 |
FE-1 |
Physical Exercise RED |
|
11:40 - 12:40 |
FE-2 |
EXERCISE-TVIS |
|
11:45 - 12:45 |
CDR |
LUNCH |
|
12:40 - 13:40 |
FE-1 FE-2 |
LUNCH |
|
12:45 - 14:35 |
CDR |
Sound muffler installation on Vozdukh with noise measurements / r/g |
|
14:35 - 15:00 |
|
CONFERENCE BETWEEN CREWS 2 AND 3 |
|
15:00 - 15:30 |
CDR |
Arm muscle evaluation / Med Ops Vol. 2 / page 3-33, item 3.6 |
|
15:00 - 15:30 |
FE-1 |
EVA Prep MO-6 / Help / Med Ops Vol. 2 / page 3-33, item 3.6 |
|
15:30 - 16:10 |
FE-1 |
ECLSS (ÑÎÆ) Maintenance / Note1 |
|
15:30 - 16:30 |
CDR |
Physical Exercise VELO + IRED |
|
16:40 - 17:10 |
FE-1 |
Arm muscle evaluation / Med Ops Vol. 2 / page 3-33, item 3.6 |
|
16:40 - 17:10 |
CDR |
EVA Prep MO-6 / Help / Med Ops Vol. 2 / page 3-33, item 3.6 |
|
16:50 - 18:20 |
FE-2 |
Physical Exercise RED |
|
17:10 - 18:30 |
CDR |
WCS [ÀÑÓ-ÑÏÊÓ] Preservative Container (E-K) and Hose Replacement / SM IVA R&R / pages 7-1 to 7-2, item 7.1.1 + r/g |
|
17:10 - 18:10 |
FE-1 |
EXERCISE-TVIS |
|
18:20 - 18:50 |
FE-1 FE-2 |
Familiarization with Next Day’s Flight Plan |
|
18:30 - 18:50 |
CDR |
Familiarization with Next Day’s Flight Plan |
|
18:50 - 19:05 |
|
Daily Planning Conference |
|
19:05 - 19:30 |
|
ISS Crew/Flight Director Conference |
|
19:30 - 20:00 |
|
DINNER |
|
20:00 - 20:30 |
|
Daily food ration prep |
|
20:30 - 21:30 |
|
Pre-sleep |
|
21:30 - 06:00 |
|
SLEEP |
NOTES:
Note 1: at MCC go: Replace
Electron, EDV-U (SM ACS, pages 4-5R, item 4.1.6.4), and EDV-SV CWCs.
Note 2: For missing references to US activities see OSTP.
End of Radiogram